The Work to be performed shall include: Stormwater detention pond improvements, including but not limited to dredging of sediment, installation of a new control structure manhole, installation of a new access driveway, site restoration, and other work necessary to complete the project. Engineer’s Estimate for this work is $375,000 to $425,000.
Bid Submittal
.
Click on the link to submit your bid. Download the "City of Redmond DocuSign bid Submission Instructions (PDF)" PDF for instructions on submitting your bid.
Join Live Event
.
Click on the link to join the bid opening. Download the "Bid Opening via Live Event Instructions" PDF for instructions on joining the event.