Washington Bids > Bid Detail
Administration Building Electric Vehicle Charging Stations
Agency: | Port of Tacoma |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15361921193694685 |
Posted Date: | May 17, 2023 |
Due Date: | Jun 14, 2023 |
Solicitation No: | 071755 |
Source: | https://www.portoftacoma.com/b... |
Administration Building Electric Vehicle Charging Stations
Contract Number:
071755
Estimated Cost Range:
Estimated cost range is $500,000 to $600,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes: Installation of concrete foundations, transformer vault, bollards, conduit, wiring, and electric vehicle charging stations and connecting them to the existing electrical system infrastructure. The work also includes, selective asphalt demolition and restoration, trenching and other miscellaneous work as described in the project documents.
Notes:
Questions Due: June 7, 2023 @ 2:00 PM (PST)
Bids Due:
Contract Number:
071755
Estimated Cost Range:
Estimated cost range is $500,000 to $600,000, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Work required for this Project includes: Installation of concrete foundations, transformer vault, bollards, conduit, wiring, and electric vehicle charging stations and connecting them to the existing electrical system infrastructure. The work also includes, selective asphalt demolition and restoration, trenching and other miscellaneous work as described in the project documents.
Notes:
Questions Due: June 7, 2023 @ 2:00 PM (PST)
Bids Due:
Wed, 06/14/2023 - 02:00PM
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.