Washington Bids > Bid Detail

Little Goose Powerhouse Controls Room Upper Annunciation

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159291905701825
Posted Date: Mar 29, 2023
Due Date: Apr 13, 2023
Solicitation No: W912EF23RSS22
Source: https://sam.gov/opp/26b7672992...
Follow
Little Goose Powerhouse Controls Room Upper Annunciation
Active
Contract Opportunity
Notice ID
W912EF23RSS22
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NWD
Office
US ARMY ENGINEER DISTRICT WALLA WAL
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Original Published Date: Mar 29, 2023 03:06 pm PDT
  • Original Response Date: Apr 13, 2023 03:00 pm PDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Dayton , WA 99328
    USA
Description

Little Goose Powerhouse Controls Room Upper Annunciation



Sources Sought Notice: W912EF23RSS22



The US Army Corps of Engineers, Walla Walla District is seeking interested offerors for construction project entitled: Little Goose Powerhouse Controls Room Upper Annunciation. The construction will occur at Little Goose Dam and will be a firm fixed price contract. The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. The North American Industry Classification System (NAICS) code for this project is 238210 Electrical Contractors and other Wiring Installation and the associated small business size standard is $19,000,000. Performance and payment bonds will be required.



This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement.



A). A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work involved, your firm’s role in the project, performance period, the dollar value and the completion date. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel.



B.) A reference list for each of the projects submitted in A) above. Include the name, title, phone number and email address for each reference.



C.) Provide a statement of your firm’s business size (HUBZone, Service Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above.



D.) Provide a statement that your firm intends to submit an offer on the project when it is advertised.



E.) Provide a statement of your firm’s bonding capacity. A statement from your surety is NOT required.



F.) Cage Code, Unique Entity ID, and DUNS Number



Submit this information to LeAnne Walling, Contract Specialist, via email to leanne.r.walling@usace.army.mil and chandra.d.crow@usace.army.mil. Your response to this notice must be received on or before 3:00 p.m. (PST) on 10 April 2023



Summary of Scope of Work:



The contractor shall provide electrical equipment/components and wiring to support the Operation, Monitoring and Control of the Little Goose Powerhouse. The following systems shall be upgraded with new electrical equipment/components and associated conductors:



Annunciation and SER (Combine SER and annunciation systems and configure/provide HMIs for control interfaces):



• PLCs and all associated I/O and wiring are to be installed.



• HMIs are to be installed in the control room, at each S-board, and at the station service panels.



Station Service (Provide new PLC equipment consistent with the powerhouse that has full indication and control of 4160V SS breakers and the powerhouse diesel generator):



• PLCs and all associated I/O and wiring are to be installed.



• HMIs are to be installed near the diesel generator and at the control room.



Digital SCC (Create a fully functional digital SCC using the existing digital governor PLC/HMI):



• New hardwired points and/or communication points are to be brought into the governor.



S-Boards (Refurbishment):




  • Demo of the wiring, meters, indicators, and all other equipment to be replaced.

  • New panels, wiring, and all associated equipment are to be installed.



The contractor shall address the need for an elevated floor within the Control Room to allow for new wiring installation under the elevated floor and new consoles.



The contractor shall demo the existing Control Room ceiling tiles, light fixtures and ceiling HVAC diffusers and provide new: ceiling tiles, light fixtures, and ceiling HVAC diffusers.




  • Anticipated Solicitation Date is 14-Aug-23.

  • Anticipated Award date is 16-Oct-23.

  • Physical construction work starting in 19-Jan-24.

  • Physical Completion anticipated 16-Jan-26.



All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).



The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.



A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations. The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.



The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.



The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award.



The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.



Miscellaneous work within the project includes the delivery of As-Built Drawings.






Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 201 NORTH 3RD AVE
  • WALLA WALLA , WA 99362-1876
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 29, 2023 03:06 pm PDTSources Sought (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >