Description:
|
The City of Redmond (Redmond or the City) is soliciting interest from consulting firms under this Request for Qualifications (RFQ) for final design services for the construction of pavement management and utilities upgrades – NE 24th St. from 172nd Ave NE to WLSP. The successful consultant/team will prepare design report, permits, plans, specifications, and estimates.
The City recently completed preliminary design of the utility upgrades and pavement overlay, including project area survey, potholing potential utility conflicts, geotechnical investigation, archaeological review, and preliminary plan and profiles showing proposed location of new utilities.
Project Specifics:
-
Replace approximately 6,200 feet of water pipe (4” – 12”), including approximately 15 water meters and service lines, two air-vac valve stations, and six fire hydrants
-
Replace approximately 2,085 feet of sewer pipe (6” – 10”), including eight manholes and eight side sewers
-
Replace approximately 615 feet of storm pipe (12”) and catch basins
-
Repave and restripe approximately three lane-miles of roadway
-
Upgrade curb ramp to existing ADA standards (number to be determined)
-
Update existing street lights from HPS to LED
|
Publication Date/Time:
|
2/14/2024 6:00 AM
|
Publication Information:
|
Project Numbers: 2319-096, -403, -404, -406
|
Closing Date/Time:
|
3/8/2024 2:00 PM
|
Related Documents:
|
|
|