The Work to be performed shall include: Construction of ten (10) dual port electric vehicle charging stations at the City of Redmond Parking Garage and one (1) dual port electric vehicle charger at the City of Redmond Maintenance Facility improvements, including but not limited to electrical conduit and equipment installation, PSE trenching, excavation and backfilling upon completion of PSE work, roadway repair and all other work necessary to complete the project. Engineer’s Estimate for this work is $260,000 to $318,000.
Bid Submittal
. Click on the link to submit your bid. Download the "City of Redmond DocuSign Bid Submission Instructions (PDF)" PDF for instructions on submitting your bid.
Join Live Event
. Click on the link to join the bid opening. Download the "Bid Opening via Live Event Instructions" PDF for instructions on joining the event.