The City is seeking an Engineering firm to provide engineering services for a new potable water well located at the City's Silberhorn Wellfield site. The design will be a 2-phased design; with the Phases being distributed as follows:
-
Phase 1: Bid documentation, well driller oversight, well testing services, final documentation of well construction & test results, bid assistance, permitting assistance, DOH coordination and ancillary services.
-
Phase 2 (Dependent on Phase 1): Site work, well house over the wellhead, new building for (MCC, chlorination, flow meter, etc.), water transmission improvements, electrical, bid documentation, bid assistance, and permitting assistance.
Please see the full RFQ below for details on the project and submittal process. A previous groundwater resource option study has been included as a separate download.
The City complies with state and federal laws prohibiting discrimination on the basis of any protected status and commits to nondiscrimination in all of its programs and activities.