Washington Bids > Bid Detail

Various Hope VI Shower Upgrades - LP Non-Federal Funding

Agency: Seattle Housing Authority
Level of Government: State & Local
Category:
  • 13 - Ammunitions and Explosives
Opps ID: NBD15508492139233340
Posted Date: Jan 29, 2024
Due Date: Feb 29, 2024
Solicitation No: 5858
Source: https://www.seattlehousing.org...
You are here Various Hope VI Shower Upgrades - LP Non-Federal Funding
Solicitation #:
5858
Category:
Construction and maintenance
Issue Date:
Monday, January 29, 2024
Due Date:
Thursday, February 29, 2024 - 2:00pm
Status:
Open
Hide Solicitation Document
Solicitation Type:
Request for Bids
Description:

The Contractor will be required to furnish and install, through self-performance or the management of Subcontractors one or more of, but not limited to the following elements of work:

1.         Demo, as needed.

2.         Main installation types:

a.         Installation of a custom sized acrylic one-piece shower pan over the existing shower pan.

b.         Installation of a custom formed one-piece acrylic shower wall system over the existing shower walls.

1)         New tempered glass shower doors

c.         Installation of a custom sized acrylic one-piece Tub and or tub surround over the existing tub / surround; or install new tub.

3.         Installation of accessories:

a.         Stainless steel grab bars:

1)         A minimum of one grab bar to be installed in each unit, but more could be needed on a case-by-case basis.

b.         Soap dish: To tie-in to existing floor drain and caulking.

c.         Shower valves: Typically, shower valves will not need to be replaced.

1)         If this is required, then SHA will review a submittal for the extra work of installation by the contractor. If approved, a Change Order will be issued to cover the additional cost of work.

4.         Conversions:

a.         Conversion from tub to shower.

b.         Conversion of existing tub/shower to an ADA roll-in shower.

5.         Repairs as needed but not limited to:

a.         Wall repair for rot/mold in walls/flooring.

6.         Finishing as needed but not limited to:

a.         Exposed edges capped with extruded molding.

Pre-bid meeting:
Wednesday, February 14, 2024, at 3:00 PM, on Microsoft Teams. Meeting link provided at end of form, after submission checklist.
Deadline to submit questions:
Thursday, February 15, 2024 - 5:00pm

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >